Multi-chamber drum

Special situations require special packaging

The multi-chamber drum enables stranding to be carried out directly on your construction site. Typically, a material with the same length (example, 3 x 500 m) is wound on to a drum.

The benefits to you:

  • Transport cost reduction
  • Simultaneous installation of several cables at the installation site
  • Simplified processes on-site
  • Complex stranding of several lines is not necessary
  • Option of returning the drum

Interested?

Call our friendly and knowledgeable sales team at our headquarters in Stuttgart quickly and easily on: +49 (0) 711 7838-01